Skip to content
Piramal MRNA Facility V3
Cramlington CSSD
Solihull Elective Hub
Autolus CAR-T Cell Facility

Transforming your vision into reality with award-winning offsite solutions

Speed, quality, affordability - built in

Leading the UK in large-scale offsite digital manufacturing

Finding a reputable company with a proven track record in delivering advanced offsite construction solutions can be demanding, especially in an industry with varying quality and reliability. That’s why at Merit, we use our unique product platform approach—pre-engineered, customisable systems designed to save you time, plant space, and money through smarter engineering and streamlined processes.

You need a company that's cost-effective, low-risk, fast, and driven by innovation. At Merit, we provide exactly that, with a proven history of delivering large-scale, high-quality complex builds.

With over 20 years of experience, we provide flexible, high-quality solutions tailored to your needs. That's why our customers choose us—and keep coming back.

Who we are

Working with and trusted by

  • Moderna
  • Piramal
  • Norfolk Community Health and Care NHS Trust Logo
  • Ashford and St. Peter's Hospitals NHS Foundation Trust Logo
  • University Hospitals Birmingham NHS Foundation Trust Logo
  • Northumbria Healthcare NHS Trust Logo
  • SGS Logo
  • Autolus Therapeutics Logo
  • UKBIC logo
  • Abingdon Health Logo
  • GE Healthcare Logo
  • Moderna
  • Piramal
  • Norfolk Community Health and Care NHS Trust Logo
  • Ashford and St. Peter's Hospitals NHS Foundation Trust Logo
  • University Hospitals Birmingham NHS Foundation Trust Logo
  • Northumbria Healthcare NHS Trust Logo
  • SGS Logo
  • Autolus Therapeutics Logo
  • UKBIC logo
  • Abingdon Health Logo
  • GE Healthcare Logo
01Design

Experience excellence in every design

Partner with an industry leader offering vertically integrated 4D BIM modelling – all in one place.

Our in-house design team is highly experienced and adept in industry codes, regulations and modular standards to ensure smooth approvals. They’ll take your vision and transform it into brilliant, functional designs, exploring various options to ensure your project meets the highest standards.

Our streamlined workflow integrates detailed designs and data, reducing errors and saving time.

Timeline comparison
02Manufacture

Strength and longevity, with no compromise

With up to 88% of your construction taking place at one of our two UK smart factories, we're revolutionising the building process so there is minimal disruption at your site.

By pre-assembling your solutions in a controlled factory environment, we can guarantee superior quality and precision using advanced robotics and rigorous quality controls. This method slashes onsite construction time, with pre-fabricated solutions arriving ready for quick assembly.

Merit's Factory Photo
03Build

Building fast, disrupting less

Once your pre-assembled components leave our factory, our expert logistics and site management teams seamlessly take over, ensuring everything arrives and is assembled without a hitch.

Unlike traditional construction, where site preparation must finish before building starts, Merit’s modular approach works smarter. We fabricate modules offsite while simultaneously preparing the site, cutting project time and boosting efficiency by completing both tasks at once.

With health and safety backed by SafeContractor, you can rely on us to deliver your project safely, on time, within budget and to the highest standards. And with our commitment to sustainability, you’ll experience fewer deliveries, less waste and a cleaner, greener build every step of the way.

Solihull Elective Hub in Construction
04Validate

Commission with confidence, validation with precision

Enjoy peace of mind knowing that we are dedicated to ensuring all tasks are completed according to FDA, MHRA, GMP, HBN and HTM regulations.

We'll expertly handle the validation and commissioning of your build, making sure all systems and components are thoroughly tested and meet regulatory standards.

Regular inspections and tests mean we catch and fix issues early. This meticulous validation process reduces the risk of construction errors, meaning no lengthy delays or costly fixes.

Solihull Elective Hub Final Photo

Damon Kent

Managing Director,
Northumbria Healthcare NHS Foundation Trust

Merit demonstrated their extensive experience in this specialist area and proposed a zero carbon solution that meets all of our specific requirements while achieving added environmental benefits ”

Our numbers merit a mention

Years of experience
22
Average project time saving
66%
Fixed cost
1
Minimum pre-manufactured value
75%

Join forces with our award-winning team

Project of the Year

Construction News Specialist Award2023

Specialist Contractor of the Year

Construction News Awards2023

Offsite Specialist of the Year

Construction News Specialist Award2023

North East Business of the Year

North East Business Awards2018

Sign up to our newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Sign up to our newsletter

Keep up to date on all the latest news, blogs and insights

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

This website uses cookies to ensure you get the best experience on our website. Please let us know your preferences.


Please read our Cookie policy.

Manage